Chapter 409
Chapter 409
Chapter 409: Efficiency Ascension
After Wang Bin completed the test of the system’s data and had some understanding of the intelligent system, Wang Bin was very satisfied with this intelligent system.
Of course, in the process of testing this system, as the technology personnel who know the development of today’s computers, they are not so calm.
After all, this system is too amazing for them. Not to mention the level of intelligence of this system, it has far exceeded the technological level of human civilization today, even if it is used by this system. Programming is crude ancient Chinese programming, which is enough to surprise them.
Of course, what they don’t know is that what they can see is actually the least important thing in this system. They can’t see the really important core programs.
At the same time, the programming they saw was only the basic programming in ancient Chinese. As for the more advanced programming, that is, the intermediate and high-level programming, Wang Bin did not let them see it. After all, compared to the basic programming, the intermediate and high-level programming The role of programming is even greater, even this system is built by intermediate and high-level programming.
In other words, as long as you understand intermediate and high-level programming, if you give time, you can definitely write a set of intelligent programs that far exceed the technological level of human civilization today. Once this program is leaked, it is definitely not for human civilization. Good thing.
Therefore, Wang Bin didn’t have the intermediate and high-level programming. After all, the basic programming of this set of programming is already very powerful, and it is definitely enough for the current human civilization.
After Tiangong Technology’s supercomputer successfully installed this intelligent system, and assigned various permissions to all departments and personnel of Tiangong Technology, Wang Bin and their Tiangong Technology, whether in management or scientific research In terms of all of them, they all reached a higher level at once.
Especially in scientific research and production, thanks to the assistance of intelligent systems, its efficiency is at least ten times higher than before.
You must know that Tiangong Technology, like today’s various production workshops of Industrial Technology, has a very high level of automation, so many automated production equipment in the workshops can be operated with brains.
Therefore, after installing the artificial intelligence system, Tiangong Technology’s supercomputer not only produces Ascension with great efficiency, but also greatly Ascension in terms of product quality.
Take Tiangong Technology’s aero engine, the original monthly production capacity was about 300 units, but after the artificial intelligence program took over the automated production equipment in the engine manufacturing workshop, if it was produced at full speed, its production efficiency would definitely be good. Achieve more than 1,000 units per month.
As for scientific research, let alone, after all, any scientific research requires a large amount of data calculation, and the larger the scientific research project, the larger the amount of calculation data required, especially for research and development such as aviation development. On, even more so.
Therefore, at this time, supercomputing is needed to perform calculations, and its technology performance is also good. The faster the technology, the greater the help it produces for scientific research. The existence of artificial intelligence greatly increases the computational efficiency. Naturally, research and development efficiency can be greatly accelerated.
Take Wang Bin and his Tiangong Technology’s latest Tiangong-6 heavy-duty rocket. Originally, their Tiangong Technology was expected to develop this rocket within half a year.
However, since Tiangong Technology updated its supercomputing system, Ascension’s R&D efficiency has been greatly improved. It was originally expected that the rocket will be successfully developed in at least three months.
Now only less than two months have passed, the design of this rocket has been completed and it can now enter the manufacturing stage.
And because many of the equipment in the factory are directly controlled by supercomputer intelligent systems, the manufacturing speed is also very fast. It is estimated that this Tiangong-6 rocket can be assembled in only 20 days.
As for the previous Tiangong-5 2000-ton rocket, they have now been successfully manufactured and an official Earth-orbiting spacecraft weighing about 40 tons has been sent into space orbit.
Therefore, after Supercomputing has artificial intelligence, its entire R&D speed of Tiangong Technology has been directly ascension.
Moreover, this is not only on the head office, but also other branches of Tiangong Technology, and even Tianyuan Optics and Tiangong Special Materials Co., which specializes in the production of civilian products. The speed of research and development of new products is obvious. Acceleration.
As for the shipyard, let alone the design and manufacturing of the ship, its speed has been greatly increased.
In terms of the construction of new ships, the construction period has been greatly shortened, and in the design of the new 10,000-ton battleship, its speed has also been significantly Ascension. It was originally expected that it would take at least a year to design, but now according to the shipyard design department The feedback, it only takes about half a year to complete the design.
…….
Tiangong Technology.
In the aircraft assembly area of Tiangong Technology, there are five or six huge workshops under construction at this time, and these workshops are larger than the other. The largest of them has a length and width of more than 500 meters, which can be said to be A veritable Big Mac.
Although most of these workshops are still under construction, two of them have been completed, and these two workshops are Tiangong Technology’s No. 1 and No. 2 aircraft assembly workshops.
Of course, logically speaking, the previous aircraft assembly workshop, that is, the aircraft assembly workshop No. 1 is already sufficient for Tiangong Technology’s current use. After all, the area of the assembly workshop No. 1 is no longer small, with a length and width of more than 100 meters. .
But for Wang Bin or Tiangong Technology, it is far from enough to have only a No. 1 aircraft assembly workshop. What’s more, in Wang Bin’s estimation, after No. 1 workshop, it is actually only used to manufacture less than 150 tons. s plane.
For larger airplanes, such as airplanes of more than 150 tons and less than 500 tons, Wang Bin is not going to be manufactured in the No. 1 aircraft assembly workshop, but is going to be manufactured in the No. 2 workshop.
As for the aircraft under 500 tons, they are going to be manufactured in workshop 3. Of course, all this is only Wang Bin’s plan. After all, there are only two aircraft assembly workshops in Tiangong Technology.
In the No. 1 aircraft assembly workshop, at this time the five Phoenix No. 1 aircraft are being intensively assembled, and some of these aircraft have just begun to lay the keel, and some have already been assembled almost. It will not take long for this Phoenix- The Type 1 aircraft can be taken off the assembly line.
Yes, as the Phoenix-1 aircraft produced by Tiangong Technology has undergone many test flights, this aircraft has also been initially approved by the military at this time, and has already issued an order to them. The first batch of orders, so at this time Tiangong Technology Phoenix-1 aircraft has entered the small-batch production stage.
FWF